Appendix B of Approved Document L Volume 1 requires photographs of six detail categories, per plot:
- Foundations / substructure — including ground-floor insulation details.
- External walls — insulation and continuity at key junctions.
- Roof — insulation at the roof, including at the eaves and any room-in-roof details.
- Openings — windows and doors: fitting and insulation around them.
- Airtightness — the details relied on for the dwelling's air permeability.
- Building services — the installed plant and services evidence.
The rules that apply across all six:
- One photograph per required detail, per plot — a photo of plot 1's wall junction does not evidence plot 2's, however identical the house types.
- Taken before closing up. This is the requirement that catches people out: once a detail is boarded, buried or covered, it can no longer be photographed. Industry reviews of the regime flag details being closed up unphotographed as a known, recurring failure — the practical answer is to photograph as you build, not at the end.
- Geo-located, dated and timed. Location services on, so each image confirms where and when it was taken.
- Filed traceably — clear which plot and which detail each image shows; Approved Document L's example filename format is 'P1/3b'.
The photographs go to your energy assessor and building control, and a copy of the evidence accompanies the signed BREL to the dwelling owner at handover. From March 2027, plots built under the Future Homes Standard have additional details to photograph — see what the 2026 edition adds.
Verified against primary sources 13 July 2026.
Did this article help?
Thanks. That helps us improve these articles.
Sorry about that. Ask it in your own words, and if our articles don't cover it, it goes to Andrew.